New dam could be option for Harpeth River

New dam could be option for Harpeth River (Image 1)
New dam could be option for Harpeth River (Image 1)

FRANKLIN, Tenn. (AP) – The U.S. Army Corps of Engineers is considering placing one or more dams on the Harpeth River, where a previously existing dam was ceremoniously removed last summer.
 
According to The Tennessean, local governments are planning a $1.4 million study to examine ways to reduce the risk of flooding and repair the river's ecosystem.

The river's watershed includes parts of Williamson, Davidson, Cheatham, Rutherford and Hickman counties.
 
A previous dam was removed at Franklin last summer, restoring the river to a free-flowing stream for the first time in 49 years.
 
The newspaper cited options for flood control that include adding one or more dams along the river.
 
The suggestion has drawn the ire at least one conservation group.

Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Related Story:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s